Hot air stove HLK120

Potting boiler for hot potting compound with or without pump unit.

Building yards, service providers, municipalities, construction companies

Self-explanatory operation via quick start guide. Telephone support and technical assistance available during our opening hours.

We would be happy to offer you user training. To do so, please contact us at vertrieb@strassenfugen.de.

Easy maintenance. Maintenance according to maintenance plan. Effort per year about 5-10 hours, depending on the design and use.

Depending on design and user up to 550 kg/per day

The stirring cooker is characterised by its robust construction and fast heating times thanks to its special boiler design. The simple and safe operation guarantees an optimal use on the construction site.

The stirring cooker is heated with gas and is ready for use very quickly. You can choose between a HLK120 or a HLK120 - pump unit. The simple attachment of the pump unit (which can be retrofitted by us) makes potting on the construction site even easier.

The HLK120 is delivered on a trailer provided by you, a system trailer specially developed by us or as a stand-alone stove.

  • Fast and material-friendly melting through indirect heating
  • Safety filling flap with agitator stop
  • Simple and ergonomic operation
  • High-quality potting results
  • Extensive accessories
  • Grouting of joints in asphalt, concrete and paved surfaces

  • Rehabilitation of cracks and damage in asphalt surfaces

  • HLK120 Standard
  • HLK120 Potting pump HLK120-VP (shown)
  • HLK120 for mastic asphalt with Hardox boiler HLK120-HX

The stirring cooker is characterised by its robust construction and fast heating times thanks to its special boiler design. The simple and safe operation guarantees an optimal use on the construction site.

The stirring cooker is heated with gas and is ready for use very quickly. You can choose between a HLK120 or a HLK120 - pump unit. The simple attachment of the pump unit (which can be retrofitted by us) makes potting on the construction site even easier.

The HLK120 is delivered on a trailer provided by you, a system trailer specially developed by us or as a stand-alone stove.

  • Fast and material-friendly melting through indirect heating
  • Safety filling flap with agitator stop
  • Simple and ergonomic operation
  • High-quality potting results
  • Extensive accessories

  • Grouting of joints in asphalt, concrete and paved surfaces

  • Rehabilitation of cracks and damage in asphalt surfaces

  • HLK120 Standard
  • HLK120 Potting pump HLK120-VP (shown)
  • HLK120 for mastic asphalt with Hardox boiler HLK120-HX

Technical data

Series hot air stove


Name HLK120


Description Potting Boiler for Hot Potting Compound


Filling volume approx. 120 - 140 L

Weight approx. 600 kg

Dimensions 130 x 130 x 110 cm (LxWxH)

Type gasoline engine


Power 4.8 kW / 6.5 hp

Type propane gas


Consumption approx. 2.5 kg/h


Ignition electric piezo

Hydraulic tank 35 L


Gasoline tank 10 L

Furnishing

Accessories & Modules

Distribution

Manufacturer

Contact us for quotes and prices.

Sales partner Nadler

Or contact our sales partner Nadler Strassentechnik GmbH.

Please feel free to contact us!